The simplest way to start managing jobs better

You do not need a migration project. You need one real job to go through properly, today.

Last updated: September 2026

Start with one job, not the business

The reason most trades businesses never start is that starting looks like a project: entering customers, importing history, deciding conventions, training people. That is a fortnight nobody has.

It is also unnecessary. The fastest way in is to take the next job that comes in and run that one job through properly, end to end, and let everything else stay where it is for now.

One job takes about twenty minutes and tells you more than any amount of planning, because the questions that matter only appear when there is a real customer at the other end.

The first hour

  1. Create the account and add your business details and logo. Ten minutes, and the logo is what makes the quotes and invoices look like a business.
  2. Add one customer you know well, with their site address and email.
  3. Raise the job. What is wrong, the priority, the site address, and book the visit on the calendar.
  4. Send a quote, even if you know the price. Watch what the customer sees and how they accept it.
  5. Do the work, then write it up on site with photographs before you drive away.
  6. Issue the invoice from the job and send it. Then watch how it gets paid.

That is the whole loop. Everything else in any job management tool is an elaboration of those six steps.

The first five days

Day one: the hour above, on a real job.

Day two: decide your conventions. Payment terms, deposit percentage, the ten charges that go in your catalogue. Half an hour, and it saves an argument with yourself every week afterwards.

Day three: one engineer, four screens. My jobs, this job, add photographs and notes, mark it done. Nothing else.

Day four: everyone else, fifteen minutes each, taught by the engineer from yesterday rather than by you.

Day five: switch. Every new job from Monday goes in, and the old system becomes history you can read but not add to.

The thing to avoid is a long parallel run. Doing everything twice for a fortnight is how a good tool gets blamed for the duplication.

Where Dispatch fits

The free plan is a single user with one report template, and it does not expire, so the first hour above costs nothing and needs no card.

There is nothing to install: it runs in a browser, and it can be added to a phone home screen in about thirty seconds. The setup checklist follows you across devices, so starting on a laptop and finishing on a phone is normal rather than awkward.

There is no configuration exercise before you can raise a job. Five job statuses, three fixed roles, one job record, and a form builder for your own customer fault report when you want one. Adding your team later is an invite code that expires in seven days, and a seat is reserved when the invite is issued so a plan cap cannot be overshot.

And if you decide against it, the export is a CSV, which is a much better position to be in than having entered two hundred customers first.

What not to do first

Do not import your customer list. Add customers as their next job arrives, and within two months the ones who matter are in there. Entering three hundred contacts on day one is how the fortnight disappears.

Do not build elaborate report templates before you have used the simple one. Do not switch on every optional feature. And do not migrate old jobs backwards, because history is for reading, not for re-entering.

The order that works is always the same: one job, then a week of jobs, then the extras.

What good looks like after a month

Every job goes in when the phone rings. Quotes go out the same day and get chased once before they expire. Jobs are written up on site with photographs. Invoices go out the day the work is finished, and you can say without checking who owes you money.

That is the whole of it, and none of it requires a large system or a long project. If you want the sceptical version of this argument first, do I really need job management software is the honest place to start.

Questions

Getting started: FAQ

What is the quickest way to start?

Run one real job end to end today: raise it, book it, quote it, write it up with photographs, invoice it. That takes about twenty minutes and answers more than a fortnight of planning.

Do I need to import my customers first?

No, and it is usually a mistake. Add customers as their next job comes in, and within a couple of months the ones who matter are all there.

How long until the team is using it?

A week is realistic: owner on day one, conventions on day two, one engineer on day three, everyone else on day four, and a clean switch on day five.

What does it cost to start?

Nothing on the free plan for a single user, which does not expire and needs no card. Paid plans add seats and report templates.

What if it does not suit us?

Export a CSV and walk away, which is why it is worth starting with one job rather than importing your entire customer list.

Run one job through it today

Free for a single user, nothing to install, and about twenty minutes from account to invoice.